EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
phowe
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (415)
Research
- (1)
Workshop
- (2)
Empennage
- (2)
Fuselage
- (71)
Firewall
- (11)
Tail Feathers
- (37)
Wings
- (86)
Controls
- (11)
Avionics
- (30)
Lighting
- (13)
Instrument Panel
- (6)
Landing Gear
- (16)
Engine
- (30)
Propeller
- (7)
Fuel System
- (18)
-
Trimmed Brackets...
-
Attached Fuel lines...
-
Electric Fuel Pump
-
Installed Header Tank
-
Header tank
-
Header Tank
-
Header Tank
-
Header Tank
-
Looking for Parts...
-
Looking for Parts...
-
Header tank
-
Header tank
-
Header Tank
-
Header
-
Header Tank
-
Header tank
-
Header tank
-
Header Tank
Interior Finish
- (46)
Rigging
- (6)
Paint / Decals
- (10)
Inspection
Tools
MISC
- (12)
Builder Name:
Philip Howe
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1711.75
Total Flight Time:
6
Total Expense:
N/A
Start/Last Date:
Oct 19, 2020 - No Finish Date
Engine:
Rotax 915is
Propeller:
Whirlwind
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=phowe
Home or Last Project Picture
Sep 15, 2023
Installed Header Tank
- (2 hours)
Category: Fuel System
Installed the header tank and repressure tested it. We did discover an issue. The tank interferes with the left side main gear brake fitting. We will reposition the brake line fitting later.
IMG_6493.jpg
Resized_20230915_111546.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.